Project Reference

ItemClientProject ClientContract No.Contract Title
1Civil Engineering and Development DepartmentMott Macdonald Hong Kong LimitedContract No. CV/2023/15Infrastructure Works at Kwok Shui Road, Tsuen Wan
2Drainage Services DepartmentDrainage Services DepartmentContract No. DC/2021/11Construction of Village Sewerage at Peng Chau and Mui Wo, Modification Works at Tai Po Sewage Treatment Works and Minor Drainage and Sewerage Works in Urban Area and New Territories
3TIML MOM LimitedTIML MOM LimitedTD 116/2018Agreement for MOM of Tsing Ma Control Area (TMCA) Emergency Repair Works for Landslip Incident in Natural Terrain near Feature No. 6SE-C/C690 of TMCA in Ting Kau (TML Project Ref: 5/G018)
4Shui On Centre Property Management LimitedBUDA Surveying LimitedN/ADesign and Build to reinstate and made good of sea water pump house, vent shaft, pipes, cables and low voltage switch room at Shui On Centre
5Drainage Service DepartmentBUDA Engineers and Consultants Co., Ltd.Contract No. DC/2020/03Structural Design and Modification of DN450 Rising main and Thrust Block within Hong Kong Golf Club, Deep Water Bay
6Drainage Service DepartmentBUDA Engineers and Consultants Co., Ltd.Contract No. DC/2020/03Construction and Rehabilitation of Rising Main at Mills and Chung Path, Deep Water Bay – Section II
7Drainage Service DepartmentBUDA Engineers and Consultants Co., Ltd.Contract No. DC/2020/03Construction and Rehabilitation of Rising Main at Mills and Chung Path, Deep Water Bay
8TIML MOM LimitedTIML MOM LimitedTD 115/2018Agreement for MOM of Tsing Sha Control Area
Enhancement of Safety Access on Slopes in TSCA
9TIML MOM LimitedTIML MOM LimitedTD 115/2018Agreement for MOM of Tsing Sha Control Area
Preventive Maintenance Works on Slopes at West Tsing Yi Viaduct, and Lai Chi Kok Viaduct in TSCA
10Highways DepartmentHighways DepartmentContract No. HY/2020/19Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways Package 5
– Pre-Contruction Works Contract P2
11Highways DepartmentHighways DepartmentContract No. HY/2018/10Highways Department-Contract No. HY/2018/10
Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways Paclage 3
– Pre-Construction Works Contract P2
12Highways DepartmentHighways DepartmentContract No. HY/2017/13Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways Paclage 4
– Pre-Contruction Works Contract PI
13Agriculture, Fisheries and Conservation DepartmentAgriculture, Fisheries and Conservation DepartmentContract No. R2/17-18Reconstruction of Kei Ling Ha Forest Track ( Phase II )
14Agriculture, Fisheries and Conservation DepartmentAgriculture, Fisheries and Conservation DepartmentContract No. R1/16-17Reconstruction of Kei Ling Ha Forest Track