Current Project

Our company (Grandway Construction Engineering Limited) signed a works contract on 15 October 2024 with The Drainage Services Department.

CONTRACT NO. : DC/2021/11

Construction of Village Sewerage at Peng Chau and Mui Wo, Modification Works at Tai Po Sewage Treatment Works and Minor Drainage and Sewerage Works in Urban Area and New Territories

Project Scope :

The works mainly include :

The works include the construction of village sewerage at Peng Chau and Mui Wo, provision of covers to primary sedimentation tanks at Tai Po sewage treatment works and associated modification works, and implementation of minor improvement works for stormwater drainage and sewerage systems at 10 locations in urban areas and New Territories. This contract commenced on 15 October 2024.

CONTRACT NO. : CV/2023/15

Infrastructure Works at Kwok Shui Road, Tsuen Wan

Project Scope :

The works mainly include :

  • construction of a footbridge across Castle Peak Road – Kwai Chung and associated lift facilities;
  • widening of a section of the existing single two-lane carriageway of Kwok Shui Road; and
  • ancillary works including drainage, sewerage, waterworks and landscaping works.

Commencement Date :

  • 28 June 2024

Contract Sum :

$88.888 million

Our company (Grandway Construction Engineering Limited) signed a works contract on 15 October 2024 with The Drainage Services Department.

The works include the construction of village sewerage at Peng Chau and Mui Wo, provision of covers to primary sedimentation tanks at Tai Po sewage treatment works and associated modification works, and implementation of minor improvement works for stormwater drainage and sewerage systems at 10 locations in urban areas and New Territories. This contract commenced on 15 October 2024.

本公司 (宏通建築工程有限公司)於2024年10月15日與渠務署簽署一份工程合約。

工程包括在坪洲及梅窩建造鄉村污水收集系統、於大埔污水處理廠的初級沉澱池進行加蓋工程以及於新界及市區內10個地點進行雨水及污水系統的小型改善工程。合約已於2024年10月15日展開。